The "dado" trunking
has been installed in all the new and refurbished class rooms,
the whole system being interlinked via cable trays installed in
the duct system. |
|
 |
The second frame is a view from the old section of
the school looking down the new extension, this area being about
70% complete at this stage. The installation method being concealed
HIP conduits and 6491-b LSF cables. Circuit protection via miniature
circuit breakers of Bill manufacture. The main contractor for the
project being Wygar Construction Co Ltd from Walsall in the West
Midlands. |
The third frame indicates the new reception
area, in this location we have the main fire alarm panel and reception
area lighting controls. The second set of doors being electronically controlled to prevent unauthorized entry. Beyond the doors are located
CCTV cameras to monitor the entry / exit location. |

|
Electrical
Contractors, Lighting Design, Plant Relocation, Electrical Engineers,
electricians, Electrical Installations, Factory Power Management, Wire
Equipment Hire, Plant Relocation from K.C. Hickson Ltd. |